MEP were engaged to provide engineering and design services for all aspects of the facility and utility modifications to accommodate the new manufacturing operations.

The M&E services included;

HVAC system design

Modification of sprinkler system, as required by revised room layouts

Building Management System (BMS) monitoring and control

Lighting, including emergency lighting

Smoke Detectors & Fire Alarms, as required

Power distribution

Abbott relocated a vessel closure manufacturing to its Clonmel facility. To accommodate these manufacturing operations, it is proposed to re-configure Suite 4 for product manufacturing. This area was previously used for ISO Class 8 manufacturing facility.